Skip to the main content block
:::
Major projects
:::
Home > Major projects

The engineering project of creating ecological environment for grand metroplitan-2

With the extension of the second project of “The Development Project of Taipei Metropolitan Park based on different phase and area ”, The target of project is to create ecological environment and activity area for water event, provide open space and associate with the development of city. Also, the swamp reservation along the gallery of Danshui river and Dahan river are included in this project. The innovative contents included ecological area at exit and entrance, Jiang Cui water park and sport rest area at left banks, Erchong floodway and green gallery along the area from new bridge to eastern side of Chonshang bridge.


The constructions between the Erchong floodway at New bridge and green gallery at the left banks of Chonshan bridge include: Shaping green area with the buildup of resting green gallery to develop ring-like cycling path and connect all the turning points in order to create multiple space for activity for the purpose of recreation.

  • Location : Banchau, Shanchon, Luchou and Wgu
  • Status : in preceding
  • Resource : The purpose of this engineering project is to make the landscape of connection between A2 stop along airport route and Hsinfu water park more smooth and gracious for Taipei MRT. Through the decoration of over climbing laders and covering hillsides wit grass to enhance the beautiful landscape around No.12 hillsides and create more friendly movement line and also strengthen the image and brightness to metropolitan park along Erchong floodway.
Back
All rights of this Website are reserved by New Taipei City. No duplication and adoption would be allowed without authorization.
The explorer version IE 8.0 would be advised to use to reach the best resolution for browsing effect.