Skip to the main content block
:::
Home > Sishui Program

The Second Phase of Flood Prevention Project-Wuchon River

The improvement target for Wuchon river is to reduce the disaster caused by floods in the affected areas, maintain the ecological environment, promote the living quality and ensure the continuous improvement of natural resources. Considering the collapsed factors around the middle and upper stream of Wuchon river, the design of the drains underground is following the criteria of government. All the connected parts of the engineer would be required to meet the higher standard by default. Different measurements including detention of floods, storage of floods and divert of floods are all considered to be the possible solution to prevent floods. Other measurements to resolve the problem of floods, like increasing the height on the bottom of depressions, the new build-up boxes to straighten the river courses and improvement to watercourses.

  • Location : River Planning Section

Back
All rights of this Website are reserved by New Taipei City. No duplication and adoption would be allowed without authorization.
The explorer version IE 8.0 would be advised to use to reach the best resolution for browsing effect.